Stage Guide
Project
Use Project to confirm:
- workspace context
- active input set
- retained run context
- next launch or inspection action
Data
Use Data to inspect:
- dataset structure
- sample rows
- input-table context
- resolved file relationships
Preflight
Use Preflight to inspect setup and prior-predictive evidence before spending
time on a full fit.
Fit
Use Fit to review model-fit completion state, core fit artifacts, and the
retained run anchor for everything downstream.
Assessment
Use Assessment to review posterior predictive and fitted-output evidence.
Validation
Use Validation to inspect holdout or blocked validation outputs when they are
present for the run.
Decomposition
Use Decomposition to inspect contribution outputs and channel-level MMM
breakdowns.
Diagnostics
Use Diagnostics for failure evidence, warnings, reports, and other retained
diagnostic artifacts.
Curves
Use Curves to inspect response-curve and related post-fit artifacts retained
for the run.
Optimisation
Use Optimisation to inspect budget-allocation outputs produced by the Abacus
optimization stage.
Planner
Use Planner to continue from a retained, planner-capable run into scenario
planning.
Planner is not a generic BI dashboard. It is a native planning workspace tied to one retained MMM run.
Export
Use Export as the final workflow hand-off stage for retained reports and
planner output bundles.