Stage Guide

Project

Use Project to confirm:

  • workspace context
  • active input set
  • retained run context
  • next launch or inspection action

Data

Use Data to inspect:

  • dataset structure
  • sample rows
  • input-table context
  • resolved file relationships

Preflight

Use Preflight to inspect setup and prior-predictive evidence before spending time on a full fit.

Fit

Use Fit to review model-fit completion state, core fit artifacts, and the retained run anchor for everything downstream.

Assessment

Use Assessment to review posterior predictive and fitted-output evidence.

Validation

Use Validation to inspect holdout or blocked validation outputs when they are present for the run.

Decomposition

Use Decomposition to inspect contribution outputs and channel-level MMM breakdowns.

Diagnostics

Use Diagnostics for failure evidence, warnings, reports, and other retained diagnostic artifacts.

Curves

Use Curves to inspect response-curve and related post-fit artifacts retained for the run.

Optimisation

Use Optimisation to inspect budget-allocation outputs produced by the Abacus optimization stage.

Planner

Use Planner to continue from a retained, planner-capable run into scenario planning.

Planner is not a generic BI dashboard. It is a native planning workspace tied to one retained MMM run.

Export

Use Export as the final workflow hand-off stage for retained reports and planner output bundles.